Longwood to Sarepta Line Tap substation interconnection queue
0 active projects
totaling 0 MW in the SPP queue, plus 2 with terminal status (shown grayed).
2 SPP queue filings name Longwood to Sarepta Line Tap as the point of interconnection, all in Bossier Parish, LA.
0active projects
0active MW
2total filed
Queue ID
Project
kV
MW
Resource
Status
GEN-2022-052
Not reported
345
850
Solar
Withdrawn
GEN-2022-051
Not reported
345
325
Battery
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with SPP before relying on these figures.