Logan Substation substation interconnection queue

2 active projects totaling 200 MW in the SPP queue, plus 3 with terminal status (shown grayed).

5 SPP queue filings name Logan Substation as the point of interconnection, all in Ward County, ND.

2active projects
200active MW
5total filed
Queue IDProjectkVMWResourceStatus
GEN-2017-214 Not reported 230 100 Wind Active
GEN-2017-215 Not reported 230 100 Wind Active
GEN-2017-216 Not reported 230 100 Wind Withdrawn
GEN-2017-235 Not reported 230 50 Wind Withdrawn
GEN-2017-236 Not reported 230 50 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.