Lawton East Side – Oklaunion line substation interconnection queue

0 active projects totaling 0 MW in the SPP queue, plus 3 with terminal status (shown grayed).

3 SPP queue filings name Lawton East Side – Oklaunion line as the point of interconnection, all in Wilbarger County, TX.

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
GEN-2022-221 Not reported 345 350 Solar Withdrawn
GEN-2022-222 Not reported 345 200 Battery Withdrawn
GEN-2022-223 Not reported 345 200 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.