Kress Substation substation interconnection queue

1 active project totaling 130 MW in the SPP queue, plus 1 with terminal status (shown grayed).

2 SPP queue filings name Kress Substation as the point of interconnection, all in Swisher County, TX.

1active projects
130active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2022-165 Not reported 115 200 Battery Withdrawn
GEN-2023-120 Not reported 115 130 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.