KC South - N. Raymore Line substation interconnection queue
0 active projects totaling 0 MW in the SPP queue, plus 2 with terminal status (shown grayed).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2018-054 | Not reported | 161 | 120 | Solar | Withdrawn |
| GEN-2022-213 | Not reported | 161 | 120 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.