Jones substation interconnection queue

2 active projects totaling 410 MW in the SPP queue, plus 2 with terminal status (shown grayed).

4 SPP queue filings name Jones as the point of interconnection, all in Lubbock County, TX.

2active projects
410active MW
4total filed
Queue IDProjectkVMWResourceStatus
GEN-2009-002 Not reported 230 306 Gas Withdrawn
GEN-2010-006 Not reported 230 205 Gas Operational
GEN-2011-045 Not reported 230 205 Gas Operational
GEN-2009-001 Not reported 230 128 Gas Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.