John W Turk Jr Power Plant Substation substation interconnection queue

2 active projects totaling 500 MW in the SPP queue.

2 SPP queue filings name John W Turk Jr Power Plant Substation as the point of interconnection, all in Hempstead County, AR.

2active projects
500active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2024-226 Not reported 345 300 Solar Active
GEN-2024-227 Not reported 345 200 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.