Substation Scout

John W Turk Jr Power Plant sub substation interconnection queue

0 active projects totaling 0 MW in the SPP queue, plus 3 with terminal status (shown grayed).

3 SPP queue filings name John W Turk Jr Power Plant sub as the point of interconnection, all in Hempstead County, AR.

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
GEN-2022-239 Not reported 345 350 Solar Withdrawn
GEN-2022-240 Not reported 345 200 Battery Withdrawn
GEN-2022-241 Not reported 345 200 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first