0 active projects
totaling 0 MW in the SPP queue, plus 2 with terminal status (shown grayed).
2 SPP queue filings name Hugoton 115 as the point of interconnection, all in Stevens County, KS.
0active projects
0active MW
2total filed
Queue ID
Project
kV
MW
Resource
Status
GEN-2009-062
Not reported
n/r
115
Gas
Withdrawn
GEN-2011-047
Not reported
n/r
22.5
Gas
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with SPP before relying on these figures.