Substation Scout

Hoskins substation interconnection queue

3 active projects totaling 688.5 MW in the SPP queue, plus 2 with terminal status (shown grayed).

5 SPP queue filings name Hoskins as the point of interconnection, all in NE.

3active projects
688.5active MW
5total filed
Queue IDProjectkVMWResourceStatus
GEN-2016-159 Not reported 345 427.8 Wind Withdrawn
GEN-2016-021 Not reported 345 298.5 Wind Operational
GEN-2016-043 Not reported 345 230 Wind Operational
GEN-2015-007 Not reported 345 160 Wind Operational
GEN-2010-026 Not reported 230 99 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.