Hoskins Substation substation interconnection queue

2 active projects totaling 385 MW in the SPP queue, plus 3 with terminal status (shown grayed).

5 SPP queue filings name Hoskins Substation as the point of interconnection, all in Wayne County, NE.

2active projects
385active MW
5total filed
Queue IDProjectkVMWResourceStatus
GEN-2017-201 Not reported 345 250 Wind Active
GEN-2023-SR7 Not reported 345 135 Battery Active
GEN-2022-SR2 Not reported 345 100.8 Battery Withdrawn
GEN-2022-SR3 Not reported 345 100.2 Solar Withdrawn
GEN-2023-SR6 Not reported 345 100.2 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.