Hoskins Substation via Turtle Creek Substation substation interconnection queue
0 active projects
totaling 0 MW in the SPP queue, plus 3 with terminal status (shown grayed).
3 SPP queue filings name Hoskins Substation via Turtle Creek Substation as the point of interconnection, all in Knox County, NE.
0active projects
0active MW
3total filed
Queue ID
Project
kV
MW
Resource
Status
GEN-2023-216
Not reported
345
200
Wind
Withdrawn
GEN-2023-217
Not reported
345
200
Wind
Withdrawn
GEN-2023-218
Not reported
345
200
Wind
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with SPP before relying on these figures.