Holcomb substation interconnection queue

2 active projects totaling 300 MW in the SPP queue, plus 2 with terminal status (shown grayed).

4 SPP queue filings name Holcomb as the point of interconnection, all in KS.

2active projects
300active MW
4total filed
Queue IDProjectkVMWResourceStatus
GEN-2011-030 Not reported 345 1,020 Coal Withdrawn
GEN-2009-021 Not reported 345 895 Coal Withdrawn
GEN-2023-172 Not reported 345 200 Wind Active
GEN-2023-173 Not reported 345 100 Wind Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.