Holcomb Substation substation interconnection queue

3 active projects totaling 1,400.5 MW in the SPP queue, plus 1 with terminal status (shown grayed).

4 SPP queue filings name Holcomb Substation as the point of interconnection, all in Finney County, KS.

3active projects
1,400.5active MW
4total filed
Queue IDProjectkVMWResourceStatus
ERAS-2025-017 Not reported 345 600 Gas Active
GEN-2024-102 Not reported 345 400.5 Wind Active
ERAS-2025-015 Not reported 345 400 Hybrid Active
GEN-2020-022 Not reported 115 125 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.