Substation Scout

Hobbs substation interconnection queue

0 active projects totaling 0 MW in the SPP queue, plus 5 with terminal status (shown grayed).

5 SPP queue filings name Hobbs as the point of interconnection, all in NM.

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
GEN-2015-009 Not reported 230 300 Wind Withdrawn
GEN-2016-169 Not reported 345 260 Solar Withdrawn
GEN-2019-026 Not reported 230 150 Battery Withdrawn
GEN-2014-063 Not reported 230 120 Wind Withdrawn
GEN-2009-038 Not reported 230 99 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.