3 SPP queue filings name Hobbs - Yoakum Line as the point of interconnection, all in Lea County, NM.

3active projects
800active MW
3total filed
Queue IDProjectkVMWResourceStatus
ERAS-2025-020 Not reported 345 400 Hybrid Active
GEN-2024-365 Not reported 345 200 Wind Active
GEN-2024-366 Not reported 345 200 Wind Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.