Hitchland substation interconnection queue
6 active projects totaling 1,599.4 MW in the SPP queue, plus 2 with terminal status (shown grayed).
6active projects
1,599.4active MW
8total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2009-072 | Not reported | 345 | 1,000 | Wind | Withdrawn |
| GEN-2006-044 | Not reported | 345 | 370 | Wind | Operational |
| GEN-2010-014 | Not reported | 345 | 358.8 | Wind | Operational |
| GEN-2011-022 | Not reported | 345 | 299 | Wind | Operational |
| GEN-2002-008 | Not reported | 345 | 240 | Wind | Operational |
| GEN-2007-046 | Not reported | 115 | 200 | Wind | Operational |
| GEN-2026-PR4 | Not reported | 345 | 131.6 | Battery | Active |
| GEN-2021-SR5 | Not reported | 345 | 126 | Battery | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.