Queue IDProjectkVMWResourceStatus
GEN-2009-072 Not reported 345 1,000 Wind Withdrawn
GEN-2006-044 Not reported 345 370 Wind Operational
GEN-2010-014 Not reported 345 358.8 Wind Operational
GEN-2011-022 Not reported 345 299 Wind Operational
GEN-2002-008 Not reported 345 240 Wind Operational
GEN-2007-046 Not reported 115 200 Wind Operational
GEN-2026-PR4 Not reported 345 131.6 Battery Active
GEN-2021-SR5 Not reported 345 126 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.