Great Bend-Spearville line substation interconnection queue

3 active projects totaling 350 MW in the SPP queue.

3 SPP queue filings name Great Bend-Spearville line as the point of interconnection, all in Edwards County, KS.

3active projects
350active MW
3total filed
Queue IDProjectkVMWResourceStatus
GEN-2019-055 Not reported 230 150 Solar Active
GEN-2025-SR4 Not reported 230 150 Battery Active
GEN-2019-053 Not reported 230 50 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.