Great Bend-Spearville line substation interconnection queue
3 active projects totaling 350 MW in the SPP queue.
3 SPP queue filings name Great Bend-Spearville line as the point of interconnection, all in Edwards County, KS.
3active projects
350active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2019-055 | Not reported | 230 | 150 | Solar | Active |
| GEN-2025-SR4 | Not reported | 230 | 150 | Battery | Active |
| GEN-2019-053 | Not reported | 230 | 50 | Battery | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.