0 active projects totaling 0 MW in the SPP queue, plus 2 with terminal status (shown grayed).

2 SPP queue filings name Grand Prairie as the point of interconnection, all in Knox County, NE.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2016-165 Not reported 345 202 Wind Withdrawn
GEN-2018-056 Not reported 345 102.6 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.