Substation Scout

FPL Moreland Tap substation interconnection queue

1 active project totaling 102 MW in the SPP queue, plus 1 with terminal status (shown grayed).

2 SPP queue filings name FPL Moreland Tap as the point of interconnection, all in Woodward County, OK.

1active projects
102active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2001-037 Not reported 138 102 Wind Operational
GEN-2005-005 Not reported 138 18 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.