Substation Scout

Flatland Substation substation interconnection queue

1 active project totaling 150 MW in the SPP queue, plus 1 with terminal status (shown grayed).

2 SPP queue filings name Flatland Substation as the point of interconnection, all in Terry County, TX.

1active projects
150active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2017-187 Not reported 115 150 Solar Active
GEN-2018-086 Not reported 115 50 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.