Evergy's Midland Substation bus substation interconnection queue

1 active project totaling 159 MW in the SPP queue, plus 1 with terminal status (shown grayed).

2 SPP queue filings name Evergy's Midland Substation bus as the point of interconnection, all in Douglas County, KS.

1active projects
159active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2021-101 Not reported 115 159 Solar Active
GEN-2021-102 Not reported 115 80 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.