Emporia substation interconnection queue

3 active projects totaling 940.1 MW in the SPP queue.

3 SPP queue filings name Emporia as the point of interconnection, all in Lyon County, KS.

3active projects
940.1active MW
3total filed
Queue IDProjectkVMWResourceStatus
GEN-2006-027 Not reported 345 380 Gas Operational
GEN-2006-028 Not reported 345 360 Gas Operational
GEN-2015-073 Not reported 345 200.1 Wind Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.