El Reno SW substation interconnection queue

2 active projects totaling 169.8 MW in the SPP queue.

2 SPP queue filings name El Reno SW as the point of interconnection, all in Canadian County, OK.

2active projects
169.8active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2022-235 Not reported 138 150 Battery Active
GEN-2017-117 Not reported 138 19.8 Battery Suspended

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.