Eddy County-Tolk (Crossroads) substation interconnection queue
4 active projects totaling 821.7 MW in the SPP queue, plus 2 with terminal status (shown grayed).
6 SPP queue filings name Eddy County-Tolk (Crossroads) as the point of interconnection, all in NM.
4active projects
821.7active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2008-022 | Not reported | 345 | 299.7 | Wind | Operational |
| GEN-2016-123 | Not reported | 345 | 298 | Wind | Operational |
| GEN-2017-078 | Not reported | 345 | 220 | Wind | Withdrawn |
| GEN-2016-124 | Not reported | 345 | 150 | Wind | Operational |
| GEN-2015-056 | Not reported | 345 | 101.2 | Other | Withdrawn |
| GEN-2016-125 | Not reported | 345 | 74 | Wind | Operational |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.