Substation Scout

Eddy County - Crossroads Line substation interconnection queue

1 active project totaling 264.3 MW in the SPP queue, plus 4 with terminal status (shown grayed).

5 SPP queue filings name Eddy County - Crossroads Line as the point of interconnection, all in NM.

1active projects
264.3active MW
5total filed
Queue IDProjectkVMWResourceStatus
GEN-2024-198 Not reported 345 500 Wind Withdrawn
GEN-2024-199 Not reported 345 500 Wind Withdrawn
GEN-2024-200 Not reported 345 300 Hybrid Withdrawn
GEN-2024-278 Not reported 345 264.3 Hybrid Active
GEN-2024-201 Not reported 345 260 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.