2 active projects totaling 300 MW in the SPP queue.

2 SPP queue filings name Eddy - Chaves line as the point of interconnection, all in Chaves County, NM.

2active projects
300active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2024-311 Not reported 230 225 Solar Active
GEN-2024-310 Not reported 230 75 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.