Dry Gulch - Pensacola Line substation interconnection queue
0 active projects
totaling 0 MW in the SPP queue, plus 3 with terminal status (shown grayed).
3 SPP queue filings name Dry Gulch - Pensacola Line as the point of interconnection, all in OK.
0active projects
0active MW
3total filed
Queue ID
Project
kV
MW
Resource
Status
GEN-2023-028
Not reported
161
230
Hybrid
Withdrawn
GEN-2023-049
Not reported
161
150
Hybrid
Withdrawn
GEN-2024-160
Not reported
161
100
Solar
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with SPP before relying on these figures.