0 active projects totaling 0 MW in the SPP queue, plus 2 with terminal status (shown grayed).

2 SPP queue filings name Deaf Smith as the point of interconnection, all in TX.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2016-099 Not reported 230 250 Wind Withdrawn
GEN-2014-010 Not reported 115 129.6 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.