0 active projects
totaling 0 MW in the SPP queue, plus 2 with terminal status (shown grayed).
2 SPP queue filings name Deaf Smith as the point of interconnection, all in TX.
0active projects
0active MW
2total filed
Queue ID
Project
kV
MW
Resource
Status
GEN-2016-099
Not reported
230
250
Wind
Withdrawn
GEN-2014-010
Not reported
115
129.6
Wind
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with SPP before relying on these figures.