Substation Scout

Crossroads Substation substation interconnection queue

2 active projects totaling 1,000 MW in the SPP queue, plus 2 with terminal status (shown grayed).

4 SPP queue filings name Crossroads Substation as the point of interconnection, all in Roosevelt County, NM.

2active projects
1,000active MW
4total filed
Queue IDProjectkVMWResourceStatus
GEN-2024-301 Not reported 345 500 Hybrid Withdrawn
GEN-2024-302 Not reported 345 500 Hybrid Withdrawn
GEN-2024-303 Not reported 345 500 Hybrid Active
GEN-2024-304 Not reported 345 500 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.