Crossroads - Hobbs Line substation interconnection queue

0 active projects totaling 0 MW in the SPP queue, plus 4 with terminal status (shown grayed).

4 SPP queue filings name Crossroads - Hobbs Line as the point of interconnection, all in NM.

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
GEN-2023-081 Not reported 345 625 Hybrid Withdrawn
GEN-2023-201 Not reported 345 300 Hybrid Withdrawn
GEN-2022-159 Not reported 345 280 Wind Withdrawn
GEN-2022-160 Not reported 345 280 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.