Clark County - Thistle line break substation interconnection queue
0 active projects
totaling 0 MW in the SPP queue, plus 4 with terminal status (shown grayed).
4 SPP queue filings name Clark County - Thistle line break as the point of interconnection, all in KS.
0active projects
0active MW
4total filed
Queue ID
Project
kV
MW
Resource
Status
GEN-2022-192
Not reported
345
300
Wind
Withdrawn
GEN-2022-190
Not reported
345
200
Wind
Withdrawn
GEN-2022-193
Not reported
345
200
Wind
Withdrawn
GEN-2022-194
Not reported
345
200
Wind
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with SPP before relying on these figures.
Site Scanner
Before you spend weeks on a site, spend seconds screening it.