Cimarron Substation substation interconnection queue

2 active projects totaling 350 MW in the SPP queue, plus 3 with terminal status (shown grayed).

2active projects
350active MW
5total filed
Queue IDProjectkVMWResourceStatus
GEN-2015-038 Not reported 345 303.6 Wind Withdrawn
GEN-2015-002 Not reported 345 200 Solar Withdrawn
GEN-2022-163 Not reported 345 200 Battery Withdrawn
GEN-2024-239 Not reported 345 200 Battery Active
GEN-2018-009 Not reported 115 150 Wind Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.