Chappelle Creek substation interconnection queue
1 active project totaling 250.2 MW in the SPP queue, plus 6 with terminal status (shown grayed).
7 SPP queue filings name Chappelle Creek as the point of interconnection, all in Hyde County, SD.
1active projects
250.2active MW
7total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2016-017 | Not reported | 345 | 250.2 | Wind | Operational |
| GEN-2022-068 | Not reported | 345 | 250 | Wind | Withdrawn |
| GEN-2022-069 | Not reported | 345 | 250 | Wind | Withdrawn |
| GEN-2022-070 | Not reported | 345 | 250 | Wind | Withdrawn |
| GEN-2023-105 | Not reported | 345 | 249 | Wind | Withdrawn |
| GEN-2016-103 | Not reported | 345 | 240 | Wind | Withdrawn |
| GEN-2016-092 | Not reported | 345 | 175 | Wind | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.