0 active projects
totaling 0 MW in the SPP queue, plus 2 with terminal status (shown grayed).
2 SPP queue filings name Chamber Springs Substation as the point of interconnection, all in Benton County, AR.
0active projects
0active MW
2total filed
Queue ID
Project
kV
MW
Resource
Status
GEN-2023-235
Not reported
345
250
Battery
Withdrawn
GEN-2023-213
Not reported
161
100
Battery
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with SPP before relying on these figures.
Site Scanner
Before you spend weeks on a site, spend seconds screening it.