Carpenter Substation substation interconnection queue
1 active project totaling 150 MW in the SPP queue, plus 8 with terminal status (shown grayed).
9 SPP queue filings name Carpenter Substation as the point of interconnection, all in KS.
1active projects
150active MW
9total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| GEN-2022-059 | Not reported | 345 | 500 | Wind | Withdrawn |
| GEN-2022-076 | Not reported | 345 | 500 | Solar | Withdrawn |
| GEN-2023-039 | Not reported | 345 | 250 | Wind | Withdrawn |
| GEN-2023-068 | Not reported | 345 | 250 | Wind | Withdrawn |
| GEN-2023-093 | Not reported | 345 | 250 | Wind | Withdrawn |
| GEN-2023-094 | Not reported | 345 | 250 | Wind | Withdrawn |
| GEN-2024-096 | Not reported | 345 | 200 | Solar | Withdrawn |
| GEN-2022-215 | Not reported | 345 | 154 | Solar | Withdrawn |
| GEN-2021-021 | Not reported | 345 | 150 | Wind | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.