Carlisle substation interconnection queue

0 active projects totaling 0 MW in the SPP queue, plus 3 with terminal status (shown grayed).

3 SPP queue filings name Carlisle as the point of interconnection, all in Hockley County, TX.

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
GEN-2016-056 Not reported 230 200 Wind Withdrawn
GEN-2014-054 Not reported 230 120 Wind Withdrawn
GEN-2014-053 Not reported 230 80 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.