Substation Scout

Bushland Substation substation interconnection queue

2 active projects totaling 550 MW in the SPP queue.

2 SPP queue filings name Bushland Substation as the point of interconnection, all in Randall County, TX.

2active projects
550active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2024-364 Not reported 230 300 Hybrid Active
GEN-2024-153 Not reported 230 250 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.