Home / SPP / Substations / Buffalo Flats Substation
Buffalo Flats Substation substation interconnection queue
2 active projects
totaling 353.6 MW in the SPP queue, plus 2 with terminal status (shown grayed).
4 SPP queue filings name Buffalo Flats Substation as the point of interconnection, all in KS.
2 active projects
353.6 active MW
4 total filed
Queue ID Project kV MW Resource Status
GEN-2017-220
Not reported
345
201.6
Solar
Active
GEN-2023-111
Not reported
345
200
Solar
Withdrawn
GEN-2023-118
Not reported
345
200
Wind
Withdrawn
GEN-2017-221
Not reported
345
152
Battery
Active
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with SPP before relying on these figures.
Site Scanner draws on HIFLD substations and electric retail service
territories, newer substations HIFLD lacks from OpenStreetMap, EIA gas transmission pipelines, HIFLD gas facilities and gas
utility territories, USGS watershed boundaries, FEMA flood hazard layers and US Census
geocoding. Queue data is compiled from public interconnection
queue filings. Every figure carries its source and retrieval date.
A withdrawal records that a request left the queue. It says
nothing about injection capacity at that location. Verify with the relevant ISO before
relying on any figure. Queue datasets are tracked separately and are
not directly comparable: status vocabularies, fuel coding, and publication
cadence all differ.
Screening aid only. Not a system impact study. Contiguous US.