2 active projects totaling 155 MW in the SPP queue, plus 2 with terminal status (shown grayed).

4 SPP queue filings name Broken Bow as the point of interconnection, all in Custer County, NE.

2active projects
155active MW
4total filed
Queue IDProjectkVMWResourceStatus
GEN-2006-038N005 Not reported 115 80 Wind Operational
GEN-2006-037N1 Not reported 115 75 Wind Operational
GEN-2010-038 Not reported 115 74.9 Wind Withdrawn
GEN-2012-039 Not reported 115 74.9 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.