Branch Substation substation interconnection queue

2 active projects totaling 276.6 MW in the SPP queue.

2 SPP queue filings name Branch Substation as the point of interconnection, all in Franklin County, AR.

2active projects
276.6active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2021-033 Not reported 161 204.1 Solar Active
GEN-2017-231 Not reported 161 72.5 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.