0 active projects
totaling 0 MW in the SPP queue, plus 3 with terminal status (shown grayed).
3 SPP queue filings name Border interconnection substation as the point of interconnection, all in Beckham County, OK.
0active projects
0active MW
3total filed
Queue ID
Project
kV
MW
Resource
Status
GEN-2021-010
Not reported
345
208
Solar
Withdrawn
GEN-2021-014
Not reported
345
208
Solar
Withdrawn
GEN-2021-012
Not reported
345
203
Battery
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with SPP before relying on these figures.