Belfield Substation substation interconnection queue

2 active projects totaling 325 MW in the SPP queue, plus 1 with terminal status (shown grayed).

2active projects
325active MW
3total filed
Queue IDProjectkVMWResourceStatus
GEN-2022-219 Not reported 230 350 Solar Withdrawn
GEN-2024-326 Not reported 230 225 Battery Active
GEN-2024-359 Not reported 345 100 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.