Atlantic Substation substation interconnection queue

2 active projects totaling 849 MW in the SPP queue.

2 SPP queue filings name Atlantic Substation as the point of interconnection, all in Finney County, KS.

2active projects
849active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2020-057 Not reported 345 424.5 Battery Active
GEN-2020-058 Not reported 345 424.5 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.