Substation Scout

Antelope substation interconnection queue

1 active project totaling 202.5 MW in the SPP queue, plus 2 with terminal status (shown grayed).

3 SPP queue filings name Antelope as the point of interconnection, all in Antelope County, NE.

1active projects
202.5active MW
3total filed
Queue IDProjectkVMWResourceStatus
GEN-2013-032 Not reported 115 202.5 Wind Operational
GEN-2015-008 Not reported 115 150.4 Wind Withdrawn
GEN-2015-053 Not reported 115 50 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.