Antelope - Hoskins substation interconnection queue

2 active projects totaling 423 MW in the SPP queue.

2 SPP queue filings name Antelope - Hoskins as the point of interconnection, all in Pierce County, NE.

2active projects
423active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2018-131 Not reported 345 221.4 Solar Active
GEN-2018-132 Not reported 345 201.6 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.