Substation Scout

Altoona- NE Parson substation interconnection queue

1 active project totaling 65 MW in the SPP queue, plus 1 with terminal status (shown grayed).

2 SPP queue filings name Altoona- NE Parson as the point of interconnection, all in Wilson County, KS.

1active projects
65active MW
2total filed
Queue IDProjectkVMWResourceStatus
GEN-2017-022 Not reported 138 65 Solar Active
GEN-2017-131 Not reported 138 29.6 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with SPP before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first