Substation Scout

SPP request GEN-2025-SR17

SPP queue ID GEN-2025-SR17

Queue request GEN-2025-SR17 was listed in the SPP interconnection queue at the end of 2025 as a 200 MW battery project in Stephens County, OK, according to Berkeley Lab’s queue data file. The filing names Terry Road Station as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 31, 2026.

Queue IDGEN-2025-SR17
Project nameNot reported
Status (as published)Active
SubstationTerry Road Station
Point of interconnectionTerry Road 345kV Station
CountyStephens
StateOK
Voltage345 kV
Capacity200 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2026-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Stephens, OK: 3 requests in the SPP queue, 1 active totaling 200 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAEP
ClusterSurplus; 04 SOUTHEAST
Interconnection serviceNRIS/ERIS
Project typeSurplus
Study phase (standardized by Berkeley Lab)IA Pending
Study phase (as the queue printed it)IA PENDING
Queue date2025-06-06

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.