SPP request GEN-2024-SR5

SPP queue ID GEN-2024-SR5

Queue request GEN-2024-SR5 was listed in the SPP interconnection queue at the end of 2025 as a 176.9 MW battery project in Creek County, OK, according to Berkeley Lab’s queue data file. The filing names Greenwood Station as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 1, 2026.

Queue IDGEN-2024-SR5
Project nameNot reported
Status (as published)Active
SubstationGreenwood Station
Point of interconnection138 kV Greenwood Station
CountyCreek
StateOK
Voltage138 kV
Capacity176.9 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2026-06-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Creek, OK: 4 requests in the SPP queue, 3 active totaling 1,676.9 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityOG&E
ClusterSurplus; 04 SOUTHEAST
Interconnection serviceERIS
Project typeSurplus
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/ON SCHEDULE
Queue date2024-02-07

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.