Queue request GEN-2024-SR5 was listed in the SPP interconnection queue at the end of 2025 as a 176.9 MW battery project in Creek County, OK, according to Berkeley Lab’s queue data file. The filing names Greenwood Station as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 1, 2026.
| Queue ID | GEN-2024-SR5 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Greenwood Station |
| Point of interconnection | 138 kV Greenwood Station |
| County | Creek |
| State | OK |
| Voltage | 138 kV |
| Capacity | 176.9 MW |
| Resource (as published) | Battery |
| Resource category | Battery (normalized for filtering) |
| Proposed online date | 2026-06-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Creek, OK: 4 requests in the SPP queue, 3 active totaling 1,676.9 MW.
Tracked changes
Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | OG&E |
|---|---|
| Cluster | Surplus; 04 SOUTHEAST |
| Interconnection service | ERIS |
| Project type | Surplus |
| Study phase (standardized by Berkeley Lab) | IA Executed |
| Study phase (as the queue printed it) | IA FULLY EXECUTED/ON SCHEDULE |
| Queue date | 2024-02-07 |