Substation Scout

SPP request GEN-2024-GR1

SPP queue ID GEN-2024-GR1

Queue request GEN-2024-GR1 was listed in the SPP interconnection queue at the end of 2025 as a 492 MW gas project in Oklahoma County, OK, according to Berkeley Lab’s queue data file. The filing names Horseshoe Lake as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 31, 2026.

Queue IDGEN-2024-GR1
Project nameNot reported
Status (as published)Active
SubstationHorseshoe Lake
Point of interconnectionHorseshoe Lake 138kV
CountyOklahoma
StateOK
Voltage138 kV
Capacity492 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2026-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Horseshoe Lake substation: 2 requests in the SPP queue, 1 active totaling 492 MW.

Queue IDProjectMWResourceStatus
GEN-2024-012Not reported496GasWithdrawn

Oklahoma, OK: 33 requests in the SPP queue, 19 active totaling 5,200.2 MW.

Tracked changes

Not tracked. SPP rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityOG&E
ClusterReplacement; 04 SOUTHEAST
Interconnection serviceERIS
Project typeReplacement
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)IA FULLY EXECUTED/ON SCHEDULE
Queue date2024-01-08

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first